1,N,N,1,See Field Notes 2,N,N,54,Power Pole 3,N,N,54,Power w\Light Pole 4,N,N,54,Power & Cable Pole 5,N,N,54,Power- Tel. & Cable Pole 6,N,N,54,PWR. TEL. CAB. Pole w/Light 7,N,N,54,Telephone Pole 8,N,N,54,TEL. & Power Pole 9,N,N,54,TEL. & Cable Pole 10,N,N,54,Light Pole 11,N,N,54,Guy Wire Pole 12,N,N,54,Power Riser 13,N,N,54,Cable TV Riser 15,N,N,52,Telephone Riser 16,N,N,52,Pay Telephone 17,N,N,54,Anchor in Ground 20,Y,N,55,Buried Power 21,Y,N,56,Buried Cable 22,Y,N,52,Buried Telephone 23,Y,N,50,Buried Water Line 24,Y,N,49,Buried Gas Line 25,Y,N,51,Buried Sanitary Sewer 30,N,Y,50,Water Valve 31,N,Y,50,Water Meter 32,N,N,50,Water Faucet 33,N,N,50,Fire Hydrant 34,N,N,50,Well Head or Hand Pump 35,N,N,9,Spring 36,N,N,33,Sprinkler Head 37,Y,Y,9,Moving Water 38,Y,Y,9,Impounded Water 40,N,N,49,Gas Valve 41,N,Y,49,Gas Meter 45,Y,Y,49,Gas Island 46,N,N,49,Gas Filler Cap 47,N,N,49,Gas Vent Pipe 48,N,N,49,Gas Drip Pipe 49,N,N,49,Gas Marker 50,Y,N,51,Septic Tank 51,Y,Y,51,Septic Drain Field 55,N,N,48,Signal Post 56,N,N,48,Signal Controller 57,N,N,48,Signal Pull Box 60,N,N,25,Sign One Post 61,Y,N,25,Sign(Chain) 62,N,N,25,Drain Marker Sign 65,N,N,52,Telephone Manhole 66,N,N,51,Sanitary Sewer Manhole 67,N,N,51,Storm Sewer Manhole 69,N,N,30,Set Estm. Marker 70,N,N,30,Fd. Conc. R/W Marker 71,N,N,30,Fd. Steel R/W Marker 72,N,N,28,Property Pin 73,N,N,28,Land Corner Marker 74,N,N,58,Traverse Station 75,N,N,27,Bench Mark 76,N,N,25,Delineator Post 77,N,N,25,Mile Marker Post 78,N,N,25,Fd. Location Survey Mkr. 79,N,N,25,Set Location Survey Mkr 80,Y,N,35,Building 81,Y,N,35,Building Overhang 82,N,N,3,Tree 83,Y,N,4,Timberline 84,N,N,4,Shrubs 85,Y,N,4,Shrub Line 86,Y,Y,32,Fence 87,N,N,32,Fence Gatepost 88,N,N,27,Mailbox 89,N,N,34,Grave Marker 90,N,Y,33,Flagpole 91,N,N,33,Satellite Dish 92,N,N,54,TV- Radio- CB- Etc. Tower 93,Y,N,33,Propane Gas Tank 94,Y,N,24,Guard Rail 95,Y,N,24,Guard Cable 100,Y,Y,21,Centerline Concrete Pavt. 101,Y,Y,20,Edge of Concrete Surface 102,Y,Y,19,Concrete Curb Flowline 103,Y,Y,19,Top Concrete Curb 104,Y,Y,41,Edge of Conc. Ditch 105,Y,Y,44,Flowline Conc. Ditch 106,Y,Y,26,Concrete Sidewalk 107,Y,Y,20,Concrete Edge of Pavement 110,Y,Y,20,Concrete Joint 111,Y,Y,41,Conc. Catch Basin 120,Y,Y,18,Edge of Bit. Shoulder 121,Y,Y,18,Aggregate Shoulder 122,Y,Y,18,Earth Shoulder 123,Y,Y,18,Concrete Shoulder 130,Y,Y,17,Entrance Aggregate 131,Y,Y,17,Entrance Bituminous 132,Y,Y,17,Entrance Concrete 133,Y,Y,17,Earth Entrance 140,Y,Y,20,Oil Surface 150,N,Y,58,Spot Elev. on Dirt 151,N,Y,58,Spot Elev. on Bit. 152,N,Y,58,Spot Elev. on Conc. 153,N,Y,58,Spot Elev. on Rock 200,Y,Y,21,Centerline Bit. Pavement 201,Y,Y,20,Edge of Bit. Surface 202,Y,Y,19,Bit. Curb Flowline 203,Y,Y,19,Top of Bit. Curb 204,Y,Y,41,Edge of Bit. Ditch 205,Y,Y,44,Flowline Bit. Ditch 206,Y,Y,26,Bituminous Sidewalk 207,Y,Y,20,Bituminous Edge of Pavement 300,Y,N,43,Reinf. Conc. Pipe 400,Y,N,43,Corr. Metal Pipe 500,Y,N,43,Vit. Clay Pipe 600,Y,N,43,Plastic Pipe 700,N,Y,43,Drop Inlet (Center) 701,Y,Y,43,Drop Inlet (Chain) 703,Y,N,41,Concrete Box Culvert 704,N,Y,41,Ditch Block 705,Y,N,43,Culvert HeadWall 706,Y,N,43,Edge of Apron 710,Y,Y,53,Railroad 711,Y,Y,53,Top of Railroad Rail 712,Y,Y,24,Bridge Pier 713,Y,Y,24,Bridge Abutment 714,Y,Y,23,Retaining Wall 720,Y,Y,40,Flowline 721,Y,Y,8,Ridge Line 722,Y,Y,58,Rock Outcrop Line 723,Y,Y,41,Levee or Dike 724,Y,Y,41,Pond Dam 725,Y,Y,8,Breakline 750,Y,N,8,Profile of Bridge Deck 751,Y,Y,8,Left Bridge Offset Profiles 752,Y,Y,8,Right Bridge Offset Profiles 753,Y,Y,8,Streambed Profile 754,Y,Y,41,Typical Channel Section 755,Y,N,8,Narrow Valley Section 900,N,N,63,User Defined 2D Point 910,N,Y,63,User Defined 3D Point 920,Y,N,63,User Defined 2D String 930,Y,Y,63,User Defined 3D String